| |
|
|
 |
| SSC: VPZ or VOZ (?) |
| |
|
|
|
|
|
| |
Profile
CAREER SUMMARY
I have over twenty-five (25) years of experience in engineering and construction industry that are all related to petrochemical plants, oil and gas projects (onshore and offshore) and infrastructure projects. The experiences were gained working overseas in Indonesia, Oman, Saudi Arabia, Nigeria, Malaysia, Abu Dhabi UAE and also in my own country, the Philippines. The exposure in various assignments had groomed me to take the responsibilities for any work aspect be it project engineering, construction, quality control, or management of construction and engineering design group.
All of my work are presented professionally using computer tools or softwares and in some cases supplemented with hand calculations and sketches. I work with various engineering teams and one of my important roles is coordination with other disciplines (engineering or construction) for work interfaces to ensure compatibility in overall design of the project. Additionally, I provide the major inputs for planning, scheduling and costing. I see my strength as being a driving force on site and in office, having the ability to make constructive decisions and get work done on time and within allowable cost.
WORK HISTORY PROFESSIONAL EXPERIENCE Feb 2003 to Present WorleyParsons, Abu Dhabi United Arab Emirates Senior Civil/Structural Engineer Provide technical assistance to Worley Middle East offices on various engineering tasks; preparation of fabrication and loadout reports, miscellaneous structural design calculations for jackets and topsides, and weight control reports for various stages of the design development.
For my main responsibility as Senior Engineer for on-shore projects, I lead the civil department in various plant engineering design and or modification. I compose methodology reports and prepare proposal packages for various clients and take responsibility for manhours estimates and tender proposal preparations for on-shore oil and gas and petro-chemical projects.
Sep 2000 - Oct 2002 Kvaerner Petrominco Engineering - Malaysia Sr. Civil/Structural Engineer Responsible for civil and structural design of BASF-Petronas BDO Phase 3 Project in Gebeng Kuantan, Malaysia. The Project was an EPC contract that included design of roads and drainage system, pipe rack structure, control room, sub-stations, tank farm, cooling tower and all miscellaneous structural works. Part of assignment was site investigation to ensure coordination with existing plant. Was relocated after the engineering phase to project construction site to handle additional field engineering requirement, resolve design issues, and provide construction assistance.
Mar 1999 - Sep 2000 Penang Shipbuilding & Const. Sdn Bhd. - Malaysia Sr. Civil/Structural Engineer Responsible for planning and development of fabrication yard to cope with various offshore fabrications schedules. Designed temporary fabrication support/foundations, made heavy lift procedures and load out schemes. Involved in bid preparations with regards to fabrication methodology and various construction procedures, and costing. Prospective projects were Larut-A, Angsi-A & B, MLNG III E11R-C, and Cakerawala (CTOC) all of which were offshore developments. Along with my assignment were conceptual designing of Naval floating facilities, engineered pre-fab control rooms for Petronas, prefab steel engineering of 3-750MW coal fired Manjung Power Plant, and improvement of ship repair yard facilities of PSC particularly the slipways.
Sep 1997 - Mar 1999 Stork-Comprimo (M) Sdn Bhd. - Malaysia Area Project Engineer Member of task force for the EPC proposal to Petronas-BASF Phase 1 joint venture project for a chemical plant in Gebeng, Kuantan, Malaysia. Responsible for pre-engineering and bulk material take-off, technical write-ups and man-hour estimate for detail engineering design and construction. Project covered process and utilities area, infrastructures such as roads and drainage system, pipe racks, and plant buildings. The EPC project was awarded to Stork-Comprimo after technical clarification meeting in held in Germany that I attended for the company for civil/structural department.
Due to another parallel equally important project, Stork assigned me in the project management of Malaysian Newsprint Industries (MNI) paper mill project in Mentakab. Responsible for additional field engineering, management of site supervision, quality control, processing of payments and variation orders, issuing site instructions and managing inter-phase coordination among various sub-contractors on site.
Mar 1996 - Sep1997 BHPE (M) Sdn Bhd. – Malaysia Sr. Civil/Structural Engineer Performed civil and structural engineering design of industrial facilities such as steel processing and manufacturing plants. Reviewed design drawings prior to Client submission, resolved technical site queries during construction, made site visits to check progress, identify problem areas and propose appropriate solutions. During the lean period in 1998, BHP seconded me to Stork-Comprimo Engineers and Contractors that I eventually joined, for the Petronas-BASF EPC project proposal.
1992 - 1996 Scado-Lummus Engineering Co. - Saudi Arabia Senior Project Engineer Lead Civil/Structural Engineer in various ARAMCO, SAMAREC and AOC projects. Responsible for civil and structural design works of projects related to oil and gas, both onshore and offshore. At one time, was seconded to an EPC contractor to manage and supervise the civil/structural designs for a marina complex comprised of gravity breakwater structures, berthing facilities and fueling station.
1986 - 1992 Petrola International - Saudi Arabia Senior Civil Engineer Assigned as Construction and Design Engineer of the marine facilities of the desalination plant for Rabigh community project of ARAMCO. Responsible for field engineering and construction management of seawater pumping station, intake head and slope protection, electrical sub-station, elevated seawater and desalinated water tank foundations, compressed air plant, and roads/drainage system. Along with the above assignments, I managed a team to supervise the work of sub-contractors for the schools, mosques, shopping centers hospital, police and fire stations. Responsibility covered checking design and drawings prior to construction and processing of progress payments and variation orders. Tasked to design a concrete chamber to be constructed below sea water.
1985 - 1986 Architects International – Oman Resident Engineer Responsible for construction of the Municipal Building for the Diwan Royal Court of Affairs ensuring contractor’s compliance to specifications and drawings. Performed inspection of all construction activities in progress to ensure high level of workmanship. Monitored the progress of work and conducted site meetings with the contractor and consultants to discuss field problems and solutions. Made periodic progress assessments and recommended approval of payments. Provided field engineering for additional work scope required by the municipal government and or his representative consultant.
1984 - 1985 A.G. Macusi Consulting Engineers – Philippines Design Engineer Responsible for civil and structural design of various reinforced concrete and steel structures including drafting supervision and preparation of other project documents. Established design requirements and liaison with project architect, owner or his delegated project consultant on technical aspects of the project and matters involving cost and contract. Conducted site inspection to resolve site problems. Conducted site visits prior to concreting particularly on major parts of the structures to ensure contractor’s compliance to design and specifications.
1983 - 1984 Societe Auxilliare D’Enterprise - Taif, Saudi Arabia Earthwork Engineer Appointed Civil Engineer in External Works Department for the National Guard Housing Project. Worked in planning and modification of road networks, drainage system and other underground utilities such as telephones, water supply, irrigation pipes and power cables. Coordinated the arrangement of various underground networks and identified all critical interfaces with other U/G structures. Then assigned to Prince Mishaal Palace project to study and make construction details of roads and sewer network. Supervised survey, layout and established level controls for construction. Later transferred to water supply and irrigation project to assist in planning and design.
1982 - 1983 Bechtel International, Inc. – Indonesia Civil Engineer Assigned in the expansion of Pertamina Oil Refinery field project engineering. Reviewed current vendor drawings to ensure compatibility with Bechtel construction drawings prior to implementation. Responsible for quality control of civil and structural works to comply with the latest approved. Also delegated to inspect erection of various plant equipment like heat exchangers, pumps and distillation columns and vessel internals. Made weekly construction schedules, material forecast and progress reports.
1979 - 1982 Arabian American Oil Co. - Saudi Arabia Design Engineer Worked in Southern Area Projects Design and Construction, Abqaiq. Involved in piping, civil, structural and architectural designs. Established design criteria and issued modification engineering work orders to external engineering consultants for plant upgrade. Performed bid evaluation and recommended award of service orders to the most complying bidder. Handled the review and approval of final design prior to acceptance of work and implementation. Did in-house engineering in coordination with plant operations, covered design of supports/foundations for pipes and various equipment, pipe racks, plant paving/grading and drainage, vessel modifications, and hot-tap calculations.
1977 - 1979 Institute of Management and Technology – Nigeria Project Manager Managed the technical administration of Estate and Works Department of the Institute. Held progress and technical meetings with engineering consultants on current and future projects. Did feasibility study of proposed buildings based on functional requirement and projected student population for school board approval. Handled the review, evaluation and award of design and construction contracts. Monitored the work of contractors to ensure compliance to design and specifications. Maintained weekly progress reports and recommended payments based on progress reports and assessments of delegated Quantity Surveyors. The projects were all reinforced concrete structures namely: multi-storey student hostels, academic complex, kitchen-dining complex, and faculty housing community, roads and drainage system.
1976 - 1977 Bechtel International, Inc. – Indonesia Civil Engineer Supervised construction of plant buildings such as administration, control, maintenance shop and fire station buildings. Coordinated the laying of pipelines feeding into these buildings such as gas, instrument air, utility and drinking water. Checked trench excavation to receive power cables, sewer lines, drainage pipes, and other underground utilities. Designed precast reinforced concrete storm sewer manholes, valve chambers, and drain pits for knock-out drums. Monitored construction activities and charted weekly progress, studied and approved deviations from working drawings and made as-built records. Attended construction meetings to discuss field problems and solutions.
1975 - 1976 Bechtel International - A.M. Oreta Construction Co. – Philippines High Rise Engineer Assigned as high-rise construction engineer of Manila Peninsula Hotel Project of which Bechtel was the Project Management Team. Responsible for planning, scheduling, and supervision of civil and structural works. Developed suitable construction methods and procedures to keep up with construction program. Checked fabrication drawings of trussed steel and other structural components, bar bending schedules, material forecast and initiated material requisitions.
1972 - 1975 Regal Builders, Incorporated – Philippines Construction Manager Managed and supervised the construction of Tropo-Scatter Facilities; a military communication complex comprised of huge radar towers, control building, power house, fuel storage tanks, elevated water tank, housing facilities, high security fencing, roads and drainage system. During early years with the company, supervised construction of various reinforced concrete and steel structures; participated in engineering design, project cost estimating and construction bid preparation.
1970 - 1972 Regal Builders, Incorporated – Philippines Manual Construction Worker to Construction Foreman to Office Engineer Started as a bar bender and shuttering carpenter and later trained to be a Construction Foreman. Being a working student taking a night school in college, I was promoted to an Office Engineer to facilitate my study. This new position opened the opportunity to an early feel of engineering in reading and interpreting construction drawings, participation in on-going projects and material take-off and cost estimating for tenders and material requisitions.
PERSONAL DETAILS
Professional Passed Professional Regulation Commission Examination Civil Engineering Licensure Examination License No. 0013383 January 1974 Professional Association of Structural Affiliations Engineers of the Philippines (ASEP) Philippine Institute of Civil Engineers (PICE) Computer Staad III / ISDS Structural Software, AutoCAD Literacy Microsoft Words, Excel, Lotus 123 etc. English Language Speak - Excellent Proficiency Read - Excellent Write - Excellent Nationality Filipino Date of Birth May 23, 1951 Height / Weight 1.73m / 80 kg Civil Status Married and blessed with 3 children Sports Bowling/Tennis Hobbies Reading, solving puzzles, carpentry, arts, painting Playing guitar and chromatica
REFERENCES
Mr. Alan Gilbert Project Engineering Manager AkerKvaerner AlanJG@myjaring.net
Mr. S. Asokan Head Civil/Structural Department Technip Geoproduction (M) Sdn Bhd Kuala Lumpur, Malaysia asokans@technip.com
Mr. Graham Bland Project Manager AMEC Shanghai, China Graham.Bland@amec.com Mr. Ng Hock Seng General Manager Penang Shipbuilding and Construction Penang, Malaysia
|
|
| |